Frank threading the pipes.
Finished with pipes.
New insulation and flashing cover.
We have been working on the wood heater whose copper pipes froze last winter, so we replaced them with galvanized and new insulation and cover. Frank cut and threaded most of the pipes (we did buy some standard sized already cut). It was a lot of work and we have yet to try it out. The pool is staying at 80* and we know we have to be here to moniter it and you know how busy we are.